Saturday, September 12, 2009

VENTSPILS, LATVIA

Laura and I have actually done very little traveling around Latvia. We stay very busy and when we get a day off we usually head to Riga for a movie, some sightseeing and shopping for essentials.

One place that we have visited before that has quickly become a favorite destination is Ventspils. This is a port town that has a nice harbor area and great beaches. We decided to take a day to drive over and enjoy the sights before the weather gets too much cooler.

When we were here last (for a Christian camp) the city was fairly crowded with tourists. This time everyone is back in school and we had the whole place to ourselves. The beach was quiet, the eating places uncrowded and no traffic.

We spent a lot of time at the beach looking for amber and just enjoying the great creation that is God's. Here are a few of our favorite pictures:

 

100_0055

 

100_0083

Bob sled runners (pushers?)made out of flowers....

100_0094

Ends of logs that are sunk in the sand for a walkway...

100_0109

Lots of pebbles and rocks on the beaches here...

100_0110

Don't know what I was thinking about but I seem to be lost in thought....

100_0117

Storm is coming in...

100_0118

Lighthouse at the end of the breakwater....

100_0147

 

100_0153

 

100_0156

 

100_0188

Latvian pine forest....

100_0193

Bluffs....

100_0235

 

100_0247

 

100_0252

 

100_0253

 

100_0256

Is she doing this on purpose?

Sunday, September 6, 2009

KIRSU IELA

Work continues on the property that has been recently purchased by Cesis Baptist Church. While we are anxious to begin the remodel and update to the building that will become the church building, we must first demolish a large building at the front of the property.

This wooden, brick and stucco building is 2.5 stories tall and is well made. We really wish we could have kept it because of the huge amount of space it offers but there is just too much repair that needs to be done. However, it is not going to do down easily. It was constructed with huge beams using old construction techniques. There aren't too many 2x4s just nailed in.

The schedule is to get this building down and the foundation smoothed out before the fall rains and winter snow arrive. We are making progress but we can't slow down or we are going to get caught.

Here are a few pictures from last Saturday's work crew.

 

100_9880

 

100_9883

Almost to the bottom floor. Top 1.5 floors have been removed

100_9885

Every piece of wood that is removed is cut up to eventually be used for heating.

100_9887

 

100_9892

Friends from Valmeira Church arrived to help...

100_9911

The cut wood is housed where Emils is standing...

100_9935

Vilma cooked up a good zupa for lunch...

100_9944

 

101_0036

Sawdust, coal dust and dirt was used for insulation. It is removed and dumped into the white bags for transporting.

100_9894